Collier County, FL
Home MenuRecommended Searches
WMP Development Archived Informational Links and Documents
WMP Development Archived Informational Links and Documents
Final Watershed Management Plans Accepted by BCC 12/13/2011
-
Vol. 3 - Discussion of Proposed Policy and Regulatory Initiatives
Vol.4 – Part a Compilation of Supporting Technical Memos (18MB)
Vol 4 - Part b
Executive Summary for 12/13/2011 BCC Meeting
Current Watershed Boundaries WMP CCME Objectives and Polices
Links
USEPA’s Watershed Planning Process
USEPA’s Watershed Academy
USEPA Florida Numeric Nutrient Information
Collier County Stormwater Maps
Collier County Stormwater Management
Watershed Management Plan Public Comment Page
Presentations
Watershed Prioritization
Background Presentation to EAC 9/5/07
Prioritization Discussion (Text)
Prioritization Discussion (Figures)
Phase 2 Existing Conditions and Plan Development
EAC Presentation 8/4/10 Update and Summary of Existing Conditions (8mb)
EAC Presentation 9/1/10 Performance Measures (For Project Evaluation)
EAC Presentation 10/6/2010 Alternatives (Projects and Regulation)
Public Workshop 11/16/2010 Presentation
Public Workshop 11/16/2010 Summary Minutes
Public Workshop 11/19/2010 Presentation
Public Workshop 11/19/2010 Summary Minutes
Public Workshops 12/17/2010 Presentation
Public Workshop 12/17/2010 Summary Minutes
Public Workshop 1/20/2011 Summary Minutes
- Conservancy Perspective on Watershed
- Conservancy GMP aspect of Watershed Plans
- Conservancy's Fertilizer Ordinance Proposal
- Watershed Plan Background
Public Workshop 1/26/2011 Presentation Fertilizer Ordinance - Green Industry discussion
Public Workshop 1/26/2011 Summary Minutes
DSAC Watershed Subcommittee 2/24/11 Background Presentation (10mb)
DSAC Watershed Subcommittee Summary Minutes
CCPC March 17, 2011 Up to Slide 58 at meeting (15mb)
DSAC Watershed Subcommittee 3/22/11 Presentation
DSAC Watershed Subcommittee Summary Minutes
Public Workshop Fertilizer Ordinance 3/28/11 Presentation
Public Workshop Fertilizer Ordinance Summary Minutes
DSAC Watershed Subcommittee Summary minutes 4/20/11
Watershed Management Plan Scope Development
Public Meeting #2 Jan. 10, 2008
Scope of Work PBS&J Phase 1 Model Development and Background
Scope of Work PBS&J Phase 2 WMP Development
Watershed Management Plan Drafts
Draft 1
- Draft Executive Summary 5/20/11
- Draft Watershed Management Plan Part 1 (includes exec. sum.) 5/20/11
- Draft Watershed Management Plan Part 2 5/20/11
Note: The 5/20/11 draft Watershed Management Plan does not include the Regulation section, this will be added soon. There will also be a companion summary of the supporting technical memos.
Draft 2 6/22/11
- Volume 1 - Executive Summary, Existing Conditions, Performance Measures
- Volume 2 - Identification of Projects, Alternative Analysis
- Volume 3 - Recommended Non-Structural Initiatives
- Volume 2 Appendix A
- Volume 2 Appendix B
Draft 3 8/17/2011
EAC Staff Summary for 9/7/11 Meeting -WMP Recommendations
- Vol. 1 – Summary of WMP, and Assessment of Existing Conditions (9MB)
- Vol. 2 – Discussion of Proposed Structural Projects (Appendices above)
- Vol. 3 - Discussion of Proposed Policy and Regulatory Initiatives
- Vol.4 – Compilation of Supporting Technical Memos Part a (18MB)
- Vol 4 - Part b
Technical Documents
Historical Fresh Water Discharge and Budget
Storm Analysis and Proposed LOS (Large file, 2 smaller files below if link doesn't work)
Storm Analysis and Proposed LOS Part 1
Storm Analysis and Proposed LOS Part 2
In-stream Water Quality - Focus is on "Impaired" parameters (updated 12/10/10)
Surface Water Pollutant Loading
Ground Water Quality and Loading
Discharge Water Quality - Focus is on nutrients and bacteria
Receiving Water Quality - Estuarine water quality (Updated 12/13/10)
Functional Assessment - Habitat condition assessment Updated 12/13/10)
Coastal Habitats - Estuarine Resources
Discharge Water Quantity - Comparison of discharge estimates Updated 4/11/11
Volume and Timing of Fresh Water Discharges
Regulation Review and Alternatives Updated 4/28/11 (Memo is dated 3/31/2011)
If downloaded between 4/25 and 4/28 substitute this page 5 change is highlighted
Non-Structural Initiatives 5/27/11
Non-Structural Initiatives 6/22/11
Wetland Mitigation within the NGGE Naples Bay watershed
North Golden Gate Estates TDR Recommendation
Fertilizer Ordinance Development Related Materials
Fertilizer Ordinance Legislation SB 494
Model Fertilizer Ordinance 2009
Model Fertilizer Ordinance 2010
Fl Friendly BMP for Protection of Water Resources
Fl Yards and Neighborhoods Handbook 2009
IFAS Unintended Consequences of Fertilizer Restrictions Updated
SWFRPC Fertilizer Ordinance Resolution
SWFRPC Fertilizer Ordinance Benefits
SWFRPC FDEP Model Ordinance Comments
Draft Collier Fertilizer Ordinance
Conservancy of Southwest Florida's Proposed Ordinance
Conservancy of South West Florida Ordinance Support
Fl. Golf Course Superintendents Statement opposing fertilizer blackout period June - September
FDOT Fertilizer Discharge Study Feb 2011
CHNEP Fertilizer Ordinance Effect presentation Feb 2011
SWFRPC Letter Regarding HB 457 & SB 606
Submittals to State Agencies for Review
Request for review of more stringent provisions
Proposed ordinance with more stringent provisions than Model Ordinance
Comments From the State Agencies
Fla. Dept. of Agriculture and Consumer Services
Fla. Dept. of Environmental Protection
U of F Institute of Food and Agricultural Sciences
Collier Proposed Fertilizer Ordinance 3/29/11
EAC Proposed Fertilizer Draft 4/13/11
Proposed Florida-Friendly Fertilizer Ordinance for Board Consideration 7/26/2011
Executive Summary Item 8B 7/26/2011
Proposed Collier County Florida-Friendly Fertilizer Ordinance
Ordinance Draft with Strikethrough and Underline changes from 6/14/11 version
Conservancy of SW Fl Support document ( supporting references are not included in link)
City of Marco Island Resolution
Final Florida-Friendly Fertilizer Ordinance
Adopted Florida Friendly Fertilizer Ordinance Page
Updated 08/30/2023