Structural Inspections
Click Code Number for Photo Example
Code | Description |
100 | Footings - to include the Utility footing rebar (UFR) |
101 | Pile Caps |
102 | Grade Beam |
103 | Floating Slab |
104 | Tie Beam |
105 | Shear Wall |
106 | Columns |
107 | Trusses/Roof Ply/W&D Bucks |
108 | Framing |
109 | Insulation |
110 | Tie Down- Building |
111 | Dry-in/Flashing |
112 | Flood Proof |
115 | Building Final |
118 | Lintel Beam |
119 | Fill Cells |
120 | Flood Vent Relief |
121 | Epicore Deck |
124 | Steel in Stair/Columns |
125 | Elevator pit |
125 | T/S Framing - also schedule required 612 Fire Inspection |
131 | T/S Drywall |
132 | T/S Insulation |
133 | Monolithic Slab-to include the Utility footing rebar (UFR) |
134 | Roofing Final |
135 | Shutter Final |
136 | Impact Glass |
139 | Termite Baiting |
140 | Interior Termite |
141 | Interior Slab Infill |
150 | Sign/ Flagpole Final |
151 | Shear Wall - Nailing |
152 | Shear Wall - Water Barrier |
153 | Shear Wall - Lath |
160 | Fence Final Building |
161 | Fence Footing |
162 | Fence Fill Cell |
163 | Mech. Ventilation Framing |
164 | Mech. Ventilation Building Final |
165 | Window/Door Replacement Non-Impact |
166 | Window/Door Replacement Impact |
167 | Shutter Add Res. Final |
168 | Shutter Add Com. Final |
169 | Re-roof Dry-In/Flashing |
170 | Re-roof Final |
171 | Remodel Res Framing |
172 | Remodel Residential Building Final |
173 | Remodel Commercial Framing |
174 | Remodel Commercial Building Final |
175 | Screen Cage Building Final |
176 | Solar Tie Down |